(12-02-2018, 11:20 AM)briantmg Wrote: I create a lot of work orders with no BOM. Sometimes we don't have the time to make a BOM. So we issue the materials to the work order. Some times, rather than buy a specific size of material for a part, we don't add material to the bom and use what we have in stock. For example, a lathe part that has a finish diameter of 0.80 inches, could be made from 7/8, 1in, 1-1/8... stock. We use what we have or what we can get.
Very interesting as when I tried this Std Cost Labour and Overhead values were lost and inventory values in GL did not match actual values via Inventory Valuation report or simple qty x Std Cost calculation.
So this is sort of an ad-hoc use... I see how that could be very useful... Thank you!
Now I just need to figure out why it does not work on my end...
Are you using:
+ Integrated GL @ INV?
+ STD cost or WAC method?
+ Labour and/or Overhead cost values on parts?
Any feedback s greatly appreciated!
So... To add raw material such as bar stock to a Work Order you have set it as a Manufactured Part? To add Labour to the Work Order it would also have to be set as a Manufactured Part, right?
PHP Code:
WHERE (stockcategory.stocktype='F' OR stockcategory.stocktype='M')
AND mbflag='M'
Now I feel a bit lost again...