Post Reply 
 
Thread Rating:
  • 0 Votes - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Expiry date became 2000-00-00 when perform Transfer Controlled Items
03-28-2014, 08:49 PM
Post: #2
RE: Expiry date became 2000-00-00 when perform Transfer Controlled Items
Hi All,

Since there is no response from the developer, I did some workaround;
1. Before transfer controlled items, copy stockserialitems table contents to Z table.
2. After transfer controlled items done, update expirationdate field in stockserialitems table from Z table.
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
RE: Expiry date became 2000-00-00 when perform Transfer Controlled Items - joadi_2003 - 03-28-2014 08:49 PM

Forum Jump:


User(s) browsing this thread: 1 Guest(s)