09-12-2013, 11:07 AM
Is there a way to have a Setup Cost that is independent of the quantity in a BOM?
For example, if I have Raw Material A, Raw Material B, and Setup Cost C making Finished Product F. 1F = 1A + 2B + $75. So no matter if the work order requires 20 F or 1000 F the setup cost will always be $75. The setup cost is essentially a die used in the manufacturing process.