Full Version: date format in MRP after update (default = 00/00/0000 = year 1899)
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
I just updated 4.7.?? to 4.11.5.

Now I have a date problem in MRP (didn't check elsewhere):

all default dates are set to 00/00/0000. If I click for the minicalendar, this corresponds to 30 nov 1899.

Do I need to set something else?

I just doublechecked: on a PO, the recommended date is today (so there the default is ok).


thanks for any help,

Klaus